12 March 2017

What I've Been Up To

M wants a new shower. She doesn't like the old one because it's too small. So we have ordered a shower pan and the old tub has been removed. I built a wall to enclose the new shower and got the pieces for the plumbing.

The drain for the tub was nestled inside a huge hole cut into the floor, so I had to cut the huge hole out to put in a piece of plywood from floor joist to floor joist. But wait...for that I must have tools!


OK, that was too many tools, so I ended up just getting the set that had the circular saw and the drill. The collecting of tools and materials took up my Saturday, so the drain and floor work was scheduled for Sunday. But lo and behold, Sunday brought this:



Fortunately it was only a light dusting, and by noon the sun had come out and it was gone. So, under the house I went to change out the water filter and install the drain. Once the drain had been assembled and tied in it was time to install the patch on the floor.

With that being done we are now ready to mix and spread mortar to bed in the shower pan and then we can start putting the surround up. She wants to go with corrugated metal for the surround, so I will have a fun time figuring out how to poke the faucet handles through the wavy metal without creating a channel for water to get in behind it.

But that will wait for another day.

1 comment:

rgranger said...

I consider any home project a rabbit hole into the local tool store...